Employer’s Head Office Building

DORCE completed the construction of the Head Office Building for KPO Oil field located in Aksai / Kazakhstan on a turnkey basis in 2008. Prefabricated Modular building system was used and completed in a short period of 5 months.

Kazakhstan
2004
General Contracting, Office / Embassy / Administrative Buildings