Aktogay Copper Mining Expansion Project – Worker Accommodation Camp Construction
The superstructure works of the project were undertaken by our company, which was completed using the Volumetric Modular Building system.
The superstructure works of the project were undertaken by our company, which was completed using the Volumetric Modular Building system.
ORCE has been completing EPC (Engineering Procurement Construction) projects in the Tengiz field, which has the largest oil reserves in Kazakhstan for more than 20 years with its local company “DORCE Kazakh”.
Shagyrly Shomyshty Gas Drilling and Processing Plant / Kazakhstan – Beynau
The Prefabricated Modular Steel Building system was used in this project with a total area of 10 thousand square meters
DORCE completed the construction of the Head Office Building for KPO Oil field located in Aksai / Kazakhstan
Kashagan Field is an oil field discovered in 2000 located in the Caspian Sea region of Kazakhstan.
The superstructure works of the project were undertaken by our company, which was completed using the Volumetric Modular Building system.
ORCE has been completing EPC (Engineering Procurement Construction) projects in the Tengiz field, which has the largest oil reserves in Kazakhstan for more than 20 years with its local company “DORCE Kazakh”.
Shagyrly Shomyshty Gas Drilling and Processing Plant / Kazakhstan – Beynau
The Prefabricated Modular Steel Building system was used in this project with a total area of 10 thousand square meters
DORCE completed the construction of the Head Office Building for KPO Oil field located in Aksai / Kazakhstan
Kashagan Field is an oil field discovered in 2000 located in the Caspian Sea region of Kazakhstan.